This BC MOTI project involved 103.3 lane km of road resurfacing at two locations along Hwy. 3 – the Hope Slide area starting at LKI 0.00 (Nicolum Park Access) to LKI 10.14 (Road right side to Snow Shed Pit) and Manning Park starting at LKI 51.90 (west of Cambie Bridge #1222 (and terminating at LKI 68.32 (Mule Deer Campsite Access).


BC MOTI Project No. 12873-2021


Kontur provided Quality Control Services to the Contractor, using MOTI Project Specifications. A Quality Management Plan based upon a detailed review of the MOTI Standard Specifications (2020) including Amendments and Special Provisions was prepared and executed.

Kontur’s services also included the monitoring of aggregates production control, compaction testing of structural fill, sampling and testing hot-mix asphalt, construction monitoring, and technical resources including a mobile laboratory testing trailer, and senior review as required.